ID Status Action Description Action Date Assigned to update
RC230409_2CLOSED Victor/Jim to clarify grant-back time for innovations for SFL and EPL. Victor/Jim see email

Victor responded by emailo and archived

RC230409_4CLOSED Victor to distribute the release model details for ratification. Victor Click here to discuss

Link available in last RC minutes. Will be added to agenda for next RC meeting

RC230409_5CLOSED Victor/Riku distribute existing Symbian and S60 Milestone definitions with SF milestones Victor/Riku This will be combined with RC230409_3 and this action closed.
RC230409_7CLOSED Victor/Jim to validate that R&D license can be used to perform operator testing Victor/Jim see email
RC230409_8CLOSED Victor to clarify if CDB, CBR are command line tools or eclipse plug-ins. Victor response can be found here
RC230409_9CLOSED Riku to clarify if all Symbian 9.4 functionality is available standalone with no dependencies on S60. Riku response can be found in post meeting note

Riku: In general, components are available unless removed as a result of TPIP filtering. Source code still available for components which are not used by S60 but these won't be maintained by Nokia.

RC230409_6CLOSED Victor to initiate the following offline actions
  • Milestone definitions - take to forums
  • Quality Metrics – set up working group
Victor Milestone defns - closed pending action RC230409_3: MSk will produce milestone defs material for review. Quality metrics - working group now set up. closed Requested
RC200509_1CLOSED Update the status and issues of providing list of components (content of builds) at next RC meeting. This is an issue that should be shared with the community. Jim 23/06 some complexities in combining S60 and SymbianOS system models given restructure of codebase. List is now 80% correct – not yet complete or verified so shared with council members today but not ready for wiki. You can see which files belong to each package from S^1.
RC200509_2CLOSED Riku to send list of TB9.1 post-branch content and defect fixes Riku 23/06 some TB9.1 changes were planned for post-branch from S^2 but actually included pre-branch, so no planned post-branch changes (of course this may change). Need discussion on process for injecting post branch changes as likely to happen in some release.

VP asked when will we start to see posting of defects through bugzilla? RM believes Nokia have started to publish showstoppers. Burden on package owner reduced as they are able to link to bug description in Mercurial. LLG asked what process was used to take in new content. VP explained that package owners need to guide it, we measure code churn + use bugzilla to track features. SF have started working through examples with package owners.

RC200509_4CLOSED Jim to explain impact of OPENGL issue on emulator and HW and what we expect OEMs to do Jim 23/06 JC - issue solved as 2.0b release of S^2 included workaround for Graphics issues which is explained in the release notes, and documented in bug31; Have ported an OpenGL open source graphics implementation to allow emulator to work. NVidia should not be an issue for emulator post S^2. But NVidia is a key issue for delivery planning in S^3.
RC230409_1CLOSEDVictor to email requesting approval of council Change Requests. Victor click here to see vote thread.

Approval of Charter was via email. Victor to update forum wiki to indicate approval of Charter. Victor to check & update mailing list (some members missing). victor: Done - deleted the thread

RC230609_3CLOSED Identify and publish technology area level test results relevant to S^2 from TB9.1 test results. 05 Aug 09 Riku Riku sent update to the mailing lit
RC230609_5CLOSED Give f/b on critical and optional TPIP lists over the next week. 03 Jul 09 All RC members email sent 26th June - Feedback Received by STE, DOCOMO and Fujitsu. Proposed to close the action based on this.
RC230609_7CLOSED Create milestones proposal ready for next RC call. 05 Aug 09 Mark Proposal created, posted here, for discussion via forumhere. Approval to be requested at August f2f.
RC230609_9CLOSED RC members to vote on bug workflow proposal posted in release council web (2 weeks). 10 Jul 09 All RC members Vote here. Voting time expire, no feedback received so we propose to implement the change and close the action
RC230609_10CLOSED Follow up putting HRP on plan, by next council mtg 05 Aug 09 Mark TI has agreed to present Zoom2 plan at August f2f RC
RC230609_12 CLOSED VP will start a discussion on the Forum about the criteria for functional completeness for S^3, including going to F&RC for key features. Please comment and will close by the end of next week. 1 Jul 09 Victor discussion here
RC230409_3CLOSED Jim/Victor clarify the difference between VT4 and functionally complete. Jim/Victor 23/06: VP can make VT4 criteria received from Riku available to use as start point for group exercise to define Functionally Complete (FC).

MSk added that quality also needs to be considered. LLG Does the quality group produce def of FC? VP clarified that the RC should lead discussion through forums and need quality group to advise on what is measurable. VP encouraged all RC members to post comments and engage actively on discussion board.

20/08/09: FC criteria proposal circulated and Release Model updated.

RC230609_1CLOSED Add agenda item for next teleconference: Process for including post-branch changes to release. (from discussion of RC200509_2) 27 Aug 09 Mark This will be deferred to f2f RC end of August

20/08/09: The scenario now relates to post-FC changes and is not tied to post TB branch changes. The release model describes expected changes during the lifecycle, e.g. post-FC only bug fixes should be picked up. After the Stabilised milestone only critical fixes will be picked up.||

RC230609_4CLOSED Get S^2 feature list from F&RC (IanH) and publish to RC 05 Aug 09 Victor Ian is working on a 10 pager document for S^2. 1st draft to be available in August.

Release spec available.

RC230609_6CLOSED To capture the details of an integration plan for S^3 that includes the first PDk, Graphics and the Zoom2 baseport. 05 Aug 09 Mark Draft plan created and sent for review by RC. Requires details of Zoom2 plan to be presented by TI at the f2f RC.

20/08/09: Updated release plan published. Zoom2 plan to be presented at RC mtg. Mitigation plan to be provided by TI is tracked by a new action RC270809_X||

RC230609_8CLOSED Send out request for volunteers for Packaging Tools WG. 05 Aug 09 Jim Raised at http://developer.symbian.org/wiki/index.php/Package_Management_Working_Group
RC230609_11CLOSED create the top items dashboard ‘RC landing page’ – for group contribution. Key technical tracks which are being worked on etc. 10 Jul 09 Urmi see here. Propose the action is closed. All suggestions/contributions welcome. Need feedback and contributions by members
RC050809_1CLOSED Send an voting request to the Release Council Email list S^2 Functional Complete as PASS 14 Aug 09 VictorP Sent email to the council asking for vote
RC050809_3CLOSED Present a proposal for SDK in S^2 at the next f2f. 27 Aug 09 UrmiS Proposal published for review.

270809: Proposal presented and accepted (on proviso that S^2 SDK could be created at a later stage if needed. This was agreed).

RC050809_5CLOSED Start a discussion in the forums to provide feedback on the key features proposed for S^3 14 Aug 09 VictorP post your comments here
RC050809_6CLOSED Start a voting poll in the forums to ratify the proposed FC Criteria for S^3 14 Aug 09 VictorP vote here
RC050809_7CLOSEDre-phrase the FC S^3 "must have" content criteria in the context of "Value of the release" 14 Aug o9 VictorP done - see proposal here
RC230609_2CLOSED Report on process for taking in new content at next council. (from discussion of RC200509_2) 05 Aug 09 Victor http://developer.symbian.org/wiki/index.php/Integration_Plan
RC270809_2CLOSED Jim/Mark to recommend that S^2 is official release and that RC will take the responsibility for approving subsequent Official Releases on behalf of the BoD. [Pending condition of the API definition and its linkage to Symbian - Official Release is linked to Trademark policy which requires existence of a compatibility test suite. Official Release status confirms that IPR is distributable.] 24 Sep 09 Jim & Mark Discussions started in SF to action steps needed.

Action RC050809_2 is part of this.

Update 110909: BoD had already declared S^2 an official release around the June timeframe. This was based on the candidate S^2 feature spec. For future releases declaration of "official" is not strongly dependent on FC being declared but does require the feature spec to be available so that the basis for the declaration is established. Clearly this means that this would occur around the FC for a release.

The recommendation to move the responsibility of reviewing and declaring the official release status to the RC will be put to the BoD prior to S^3 FC.

The availability of the compatibility test suite is being pursued via RC050809_2.

Propose to close this action.

RC270809_3CLOSED All members to review and provide comments on the detailed Graphics integration plan by 11th September to Victor 11 Sep 09 All RC Members Plan can be found in the release plan material embedded in the minutes of the 27 Aug f2f RC in Helsinki. Feedback received from Philippe Peruset (STE). No objections raised from any members. Laurent raised concern about testing on real HW. This will be raised as part of the Test WG
RC270809_4CLOSED Mark to talk to Ian Hutton about obtaining feature spec for S^3 (along same lines as for S^2) 24 Sep 09 Mark The feature spec is generated around the time the release achieves FC and describes the total feature set, including the Key Features. One of the criteria for the FC is to ensure that the release has delivered the agreed Key Features which are initially defined at Release Start and may be modified after with agreement by the RC.

Update 110909: Confirmed with Ian.

Discussion raised on Laurent (TI) proposal to review/approve detailed feature list at RS and then track deltas. This will be raised as a new action for Laurent to lead a forum discussion/workshop.

RC270809_5CLOSED Update Key Features list in line with the comments in the 27 Sep f2f minutes "Key Features required for S^3" section 24 Sep 09 Victor This needs to include any breaks that should be tracked as well as listing what features of any phased rollout will be delivered, e.g. SHAI and SMP. The RC also needs to be told where to look for any other features it may want to include, such as TD roadmaps and Package Backlogs
RC270809_6CLOSED S^3 FC criteria discussion. Discussion around ‘agreed feature list’. Noted the following: - This should say "key feature list". KFs could change and should be under under change control by RC - We need to add the word ‘delivered’ to this statement - Remove ‘ratified by the FRC’ Update with the above clarifications. 24 Sep 09 Anders & Mark 220909: Updated wording provided to RC members for comment
RC270809_7CLOSED Zoom2 plan. Riku noted that some of the TI code was below SHAI, some above. Pierre-Henri added that if TI wanted to protect features linked to hardware, perhaps the boundary should be at SHAI. Riku added that with the current licencing model, if there are good ideas which could be used for SHAI then they can’t be made available. Laurent to explore these suggestions and provide a response 24 Sep 09 Laurent HRP sw contribution is not related to SHAI but to HRP provider IP diffentiators (HW+SW). In the same way nokia will not contribute all their above shai layer sw (their IP/differentiators), so hrp sw cannot be partitioned with shai.

This is a decision that TI needs to make in conjunction with the AC.

RC270809_8CLOSED Laurent to come back with an update to the Zoom2 plan within two weeks as stated in the TI chartpack 11 Sep 09 Laurent Updated plan presented by Fred Blesser at RC conf call 240909. Plan progress will be tracked separately
RC270809_9CLOSED Matsuura-san asked which specific issue prevented SBS v1 (TPIP) from being included in the SDK. URMI to respond to this request 24 Sep 09 Urmi Nokia are contributing SBSv2 (raptor) and this is what they plan to suport and make available under EPL.

SBSv1 is available under SFL, and so members are able to use it in S^2, and once the EULA has been agreed, it would be possible to make this available in the non-member PDK as well. However there are no plans to support it, or make it available under EPL.

RC270809_10CLOSED All council members to give feedback over the next 2 weeks on the content and schedule of the SDK/PDK plan 11 Sep 09 All RC Members Confirmed that there were no objections
RC270809_11CLOSED Release model: Anders raised that some discretion may be needed in approving milestones, e.g. we could agree to passing FC knowing that a small feature still to be delivered – so it becomes an exception. 24 Sep 09 Mark This shouldn't be part of the criteria as exceptions can always be the case. However, the notes could be used to describe this possibility.

Note added to release model to describe this

RC050809_2CLOSEDCheck with Daniel Rubio what is the level of compatibility of S^2 with Symbian^1 9 Oct 09 Victor Talked to Daniel. The AC has to define yet what is considered as public APIs. Once this is done, they will identify the public APIs in the SDK for S^1, and S^2 should run a compatibility assessment against it. The agreement is that S^2 and S^1 need to be compatible.

Public API definition being pursued by DM team and compatibility suite will be derived from existing S^1 suite. This will be enhanced to provide S^2 compatibility suite.

Update 301009: Public API list made available on wiki. See http://developer.symbian.org/wiki/index.php/Symbian%5E2_Public_API_List

AC has approved this list subject to clarification on supporting documentation. Also more information is being sought on the whitelist to identify why these breaks were approved.

The compatibility test suite is being created by SF Delivery Management.

RC050809_4CLOSED Nokia to provide feedback on the likelihood of the key features being delivered in S^3 22 Oct 09 Riku & Jussi This will be on-going but S^3 KF list needs to be verified to ensure features are committed

Agreed to get closure 1 week before Oct f2f. Important to have good story on SHAI, SMP and NFC.

Update 301009: Conflicting information over NFC availability in time for S^3. Jussi to confirm. This is being tracked by new action RC301009_6

RC270809_1CLOSED Riku will update RC on the status of the plan for package owners to move to package based releasing and testing 29 Oct 09 Riku Riku was hoping to have a plan for the 24thSep conf call. New view is to have plan for the Oct f2f.

Update 301009: Agreed to cover the testing part of this under the Test WG. As far as the package-based releaseing goes, processes and tools are expected to be in place by year end 2009. This describes how packages are released to Mercurial but not how we build PDKs (this will be covered by the foundation)

RC270809_12CLOSED All council members to read Jim’s Packaging Tools proposal and nominate suggested members of the WG 24 Sep 09 All RC Members Request for participants posted here http://developer.symbian.org/forum/showthread.php?t=3011

More volunteers needed but close to a quorum. Need at least one PkO or rep. Riku will clarify the purpose of the WG with Jim.

Update 301009: Team now identified. Jim to kick off.

RC270809_13CLOSED RC council members to propose volunteers for a Test WG proposal 2 Oct 09 All RC Members Members proposed:
  • Chandra Narayanasamy (Cell/Fujitsu) - with support from Stefan Fager
  • Pierre Leblond (STE)
  • Mikael Christersson (SEMC)
  • Janne Kolari (Digia)
  • Fred Maurel (TI)
  • Name to be confirmed (Nokia)

Test expertise on the team will also be provided by SF.

Update 301009: Team identified except waiting for Nokia name to be confirmed.

Overview of tesing provided by Jim in his blog. Kick off meeting to be held within next two weeks. Team to write mandate.

RC240909_1CLOSED Laurent (TI) to provide proposal for feature review and set up forum discussion 9 Oct 09 Laurent This is to gather community opinions on the issue of ‘what is tracked’ in the feature list by the Release Council.

Update 301009: Laurent provided prooposal which was discussed at the RC tactical workshop on 29 Oct and will be progressed through actions from that.

RC240909_3CLOSED Provide high level plan for S^4 for review at Oct f2f 22 Oct 09 Urmi Make available 1 week before the f2f

Update 301009: Done and reviewed at 30 Oct RC f2f.

RC240909_4CLOSED Start a forum to discuss showstopper defects 2 Oct 09 Matsuura-san Main focus of this will be S^2 but definitions should apply generically to other releases. Forum started by Matsuura san.

Update 301009: Not many comments so far but initial list of showstoppers provided by Nokia. Forum will remain open for discussion.

RC240909_5CLOSED Members to put forward ideas for workshops to be held as part of the Oct f2f 9 Oct 09 All members Some suggestions: Generating, reviewing & managing the detailed feature set for a release; WG sessions (this may require other attendees from member companies depending on who has been nominated to sit on WGs); etc....

Update 301009: Workshops held 29 Oct.

RC240909_6CLOSED Provide a list of 'showstopper' defects for S^2 in Bugzilla 23 Oct 09 Riku This was originally agreed by Nokia but is still outstanding hence the creation of this action to track. A plan is needed for this.

Update 301009: Jussi confirmed that a list of showstoppers has been provided in Bugzilla.

RC301009_1CLOSED Add agenda item to RC meetings for MCP input. Also ensure that proposals pipeline page is updated to show which MCPs RC should review 3 Dec 09 Mark Added to 101209 agenda (and will be on future agendas). Proposals pipeline updated to show MCPs for RC review. See http://developer.symbian.org/wiki/index.php/Proposals_pipeline. Email also sent to RC & Chairs with background on RC requirements of MCPs.
RC301009_2CLOSED Create a forum discussion by posting TI's proposal on the detail to be provided in each feature. 13 Nov 09 Laurent LG Forum created here: http://developer.symbian.org/forum/showthread.php?p=11515#post11515
RC301009_4CLOSED Clarify the plan for identifying 'real' breaks for S^2 13 Nov 09 Sebastian B Confirmed that break info will be available w47. Update 191109: Info here http://developer.symbian.org/wiki/index.php/Symbian%5E2_Compatibility_Breaks
RC301009_6CLOSED How many other TPIP items are remaining for S^2 (the ones listed for the FC were the 'must-haves'). Come back with a response to this. 3 Dec 09 Victor Chris Davidson presented the status at the 10/12 RC meeting
RC301009_7CLOSED Confirm NFC availability and dates 13 Nov 09 Jussi A Need to assess whether NFC will be available for S^3. Update 101109: NFC confirmed to be available for S^3 but delivery very close to FC. Plan being discussed to mitigate this but may need to investigate post-FC delivery.

091209 UPDATE: NFC not planned to make S^3 FC. Will be reviewed in 101209 RC call.

RC301009_8CLOSED Provide update to ZoomSW plan. Dependencies need to be understood 20 Nov 09 Laurent LGLaurent sent update after the RC call
RC301009_9CLOSED S^4: Add delivery dates for KFs on the table (and ensure alignment with integration plan) 3 Dec 09 UrmiDates available for some features. Reviewed in 101209 call. Close as this is business as usual for creating S^4 plan
RC301009_10CLOSED S^4: prepare status update on RS for RC conf call in December with view for RC to ratify either at that call or before the Christmas break 3 Dec 09 UrmiStatus update available for review
RC301009_11CLOSED RC to feed back comments on Quality metrics and dashboard to QWG via qwg(at)lists.symbian.org email 19 Nov 09 RC members One response received. Update 101209: First set of metrics has been released. Feedback can be made on these at any time via QWG.
RCW1291009_6CLOSED Set up call with RC to discuss next steps for actions RCW1201009_1 to _5 13 Nov 09 Mark S Call held 191109
RC101209_1CLOSED Quality: How many of the defects raised against S^2 are raised by the community vs raised by SF 9 Jan 10 Victor see email send on 14 Jan
RC101209_2CLOSED Quality: Take the critical S^2 defects to PkOs and get them to give their view on actual severity ASAP 18 Dec 09 Victor this is being handle as part of the defect scrub
RC101209_3CLOSED CalDav info: send a link to the wiki page to the RC 18 Dec 09 Victor see email send on 14 Jan
RC101209_4CLOSED Set up workshop for FC criteria including Quality and Testing and covering S^3 and S^4 9 Jan 10 MarkWorkshop arranged for Jan 13th
RC101209_5CLOSED Summarise MCP information from RC and provide a way forward via email or forum 23 Dec 09 Mark MCP summary sent to RC and council chairs. Will be reviewed at Jan RC f2f
RC101209_6CLOSED UI WG: Provide update on status via email to RC 23 Dec 09 UrmiUpdate available at Tokyo RC mtg
RC301009_5CLOSED Lead a discussion via the RC Forum to clarify the conditions for 'Stabilised'. Set this going by 13/11. Review at next RC conf call 10th Dec 13 Nov 09 Chandra N Mark emphasised that the intent is not to reopen the Release Model but to clarify these points. Chandra has posted the following discussion forum: Please see the following link, http://developer.symbian.org/forum/showthread.php?t=4124

We will review via the forum and also appears on the agenda for the Tokyo f2f, Jan 15th.

Chandra presented Fujitsu's proposal on conditions for Stabilised. This was discussed with the RC (see minutes: http://developer.symbian.org/wiki/index.php/RC/2010-01-13_RC_meeting#S.5E2_Status_-_Victor) and a follow up action has been recorded: RC140110_4: Chandra N to update the definition and implications of the Stable milestone and publish for review by the RC

RC240909_2CLOSED Develop a strawman proposal for handling submission of features after FC 9 Oct 09 -> 3 Dec 09 -> 14 Jan10 Urmi It is expected that any features delivered after FC will not be Key Features.

Update 301009: Strawman planned to be provided by next RC mtg (10th Dec)

Update 101209: This should be discussed ahead of the S^3 FC but is not high priority at this point. Review at next call.

Update 020210: thread to discuss impact and next steps created. Propose next steps at Feb call. http://developer.symbian.org/forum/showthread.php?p=15648#post15648

Update 240210: Have suggested an amendment to MCP Review Criteria (now posted here) to indicate which MCP would pose great risk for late integration. Also Propose an amendment to FC notes on Release Model to advise that acceptance criteria/plan for late integration of risky features should be provided at FC

RC140110_2CLOSED Nokia to identify PkO rep for defect scrub 22 Jan 10 Rauno UHari Lammi named
RC140110_3CLOSED TI to identify PkO rep for defect scrub 22 Jan 10 Laurent LGLaurent will be the rep
RC140110_5CLOSED Define a subset of the S^3 FC test suite for S^2 Stable milestone Laurent & Fred Maurel have provided a proposal to the Test WG for use cases from TI as a starting point. Mark SThe need for a S^3 FC test suite has been discussed with the Test WG. A subset needs to be selected for S^2. The need for S^3 test suite raised with TWG (TWG actions: 040210_4 AND 040210_6). When available a subset can be chosen for S^2. This will require input from the community.
RC140110_7CLOSED Ask Chris Davidson to provide a TPIP update at the next RC meeting 11 Feb 10 Mark S Chris will provided update offline. Will also provide update at f2f meetings.
RC140110_8CLOSED Fujitsu/Docomo to provide a contribution plan for submitting defect fixes to the SF 15 Feb 10 Matsuura-san Plan submitted and will be reviewed at Feb call.
RC140110_9CLOSED Request FRC/AC to look at what core or critical apps are needed as a basic config for S^4 18 Feb 10 Mark S Urmi has discussed this with FRC. Salvatore Rinaldo and Urmi came up with as list of apps packages which would be regarded as key, in order to identify the must have items for UI migration. These are published in the current release plan and will be publshed on the wiki if required.
RC140110_11CLOSED Arrange call with SF to isolate cause of Zoom2 crash on boot-up of PDK3.0.e 31 Jan 10 Laurent LGe-mail exchange made with SF. Compatibility break introduced by NGA under work also on emulator by SF in parallel. All latest info at: http://developer.symbian.org/wiki/index.php/Graphics_Package/KhronosReferenceImplementation. Crash investigation is ongoing work to be monitored in zoomII status in RC conf call / meeting.
RC140110_13CLOSED Provide a plan for S^4 pkg backlogs 12 Feb 10 UrmiThis is needed for S^4 planning info. Update 240210 - DUI package backlogs, breakdown of remaining key items provided in release plan slides.
RC140110_14CLOSED Define the content of the first S^4 contribution and the planned date 12 Feb 10 Urmi Contribution planned for end March. Content will be defined nearer the time.
RC301009_3CLOSED Confirm AC ratification of S^2 Public APIs 6 Nov 09 Daniel Rubio Definition of public APIs reviewed with AC. Final API baseline will be reviewed by email (plan by w49).

Additional APIs to be added and reviewed with the AC Thurs 25th Feb 2010.

4/3/10: No objections or comments raised by the AC to the final API list. Baseline is ratified by AC. See the following email

RC140110_6CLOSED Review the TPIP process/management to clarify the agreement on TPIP for S^2. Also propose any changes needed to ensure the process for TPIP agreements is clear Victor PUpdate 090310: the TPIP sheet has now a new column that clearly indicates what items will be delivered in what release vs what release is impacted by he IP whole